Planning a custom home or major build in Melbourne? The hardest part isn’t finding a builder, it's choosing the right one. This guide cuts through the noise so you can compare apples with apples: costs, timelines, proof, and fit. And because this is written for BG Construction clients, you’ll see real local examples and a practical checklist mindset. If you’ve been searching for construction companies in Melbourne, here’s a grounded way to make a confident choice.
Look for jobs like your narrow urban sites, sloping blocks, heritage areas, or coastal builds. A builder that regularly tackles your type of site will price and programme more accurately.
Ask for a build program that splits design & approvals versus construction. Good builders explain milestone dates (frame, lock-up, fix, practical completion) and how they handle weather or supply delays.
Who do you actually deal with: an estimator, a supervisor, or a director? BG Construction is director-led, with weekly updates, site photos and scheduled walkthroughs so you always know where things stand.
Long-term trade partners and proven products make a measurable difference to finish and durability. Ask which window systems, insulation, and waterproofing systems are standard and why.
NCC 2022 energy performance, BAL (where applicable), and building surveyor engagement should be integrated from day one not tacked on at the end.
Download a one-page “Builder Comparison Checklist” and tick off the seven points above while reviewing quotes.
A thorough inclusion schedule prevents budget drift. Your quote should name the actual items (e.g., engineered timber floor, R5.0 ceiling insulation, thermally broken windows), not just “quality flooring” or “energy efficient glazing.”
PCs are allowances for selections such as tapware or appliances. Keep them realistic, and make sure the brand/series level matches your expectations.
PS cover works that can’t be finalised at quote time think rock excavation, retaining walls, or service upgrades. Your builder should explain the assumptions behind each PS so you understand the range.
Ask for a sample selection sheet. You’ll see how decisions are documented and priced before construction.
Every project is unique, but a sensible guide looks like this:
What actually causes delays? Late selections, unresolved engineering, or planning overlays. At BG Construction, the programme is confirmed before site start, with weekly updates and milestone walkthroughs at frame, lock-up and pre-paint so you stay in step with the build.
Comfort and running costs matter. Here’s how we approach 7-Star outcomes without drama:
Small, early choices here reduce long-term costs and lift day-to-day comfort.
Line up inclusions and allowances, then check programme, supervision, and communication. Ask each builder to explain their biggest PC/PS items.
Commonly 9–14 months after permits, depending on complexity and access. Your programme is confirmed once design and engineering are final.
Both. We regularly collaborate with external architects and can introduce trusted design partners if you prefer a single team.
Yes. We frequently deliver split-level and narrow-frontage homes with sensible structural solutions and predictable costs.
We coordinate town planning (where required), building permits, energy reports, engineering and the building surveyor.
Statutory warranties apply; we also provide a clear defects liability process and a practical handover pack with manuals and maintenance guidance.
Melbourne CBD and surrounds; Inner East (Hawthorn, Kew, Camberwell); Inner North-West (Essendon, Aberfeldie); Bayside (Brighton, Hampton, Sandringham); South-East (Malvern, Caulfield); North (Fitzroy, Northcote, Thornbury); West (Yarraville, Williamstown); and the Mornington Peninsula (Mount Eliza, Mornington, Merricks).
If your suburb isn’t listed, we probably still build there ask us.
If you want a clear scope, a realistic programme and a home that feels as good as it looks, let’s talk.